New York Yimby, December 2, 2015
After participating in a facilities and equipment study, Kohler Ronan was asked back to the heart of Broadway’s Theater District to design MEP/FP systems supporting renovations including substantial upgrades to the MEP/FP infrastructure at the back-of-house, as well as public and support spaces throughout the theater.
Architectural Digest, September 21, 2015
Kohler Ronan is pleased to be part of the project team selected to support the extensive renovations planned for the flagship Midtown Manhattan location of the New York Public Library.
Boston Globe, July 3, 2015
Kohler Ronan is providing MEP/FP and significant energy analysis for this unique UVA project encompassing the complete restoration of the historic Jefferson Rotunda.
New York Times, May 12, 2015
Kohler Ronan is pleased to have provided MEP/FP engineering design services in support of a truly unique space at the Mystic Seaport Museum in Mystic, CT.
Due to open in September of 2016, the Thompson Exhibition Building will afford the Mystic Museum a new visitor center, gift shop and versatile exhibition space. In addition to its striking architecture, the 14,000 sf wood and glass structure incorporates some interesting engineering design features including closed loop geothermal heating and cooling systems, museum quality temperature and humidity controls, custom sprinkler systems, and specially designed fabric ducts to coordinate with the particular slope and structure of the building.